The slab bin will contain wood for burning it in the boiler to power the steam engine in the mill.
The sides are made with board-by-board construction:
I added an operating sliding door and a chute:
Next was the chain that lifts the door and a ladder:
Here is the completed slab bin filled with wood:
No comments:
Post a Comment