Showing posts with label sawmill. Show all posts
Showing posts with label sawmill. Show all posts

12/12/2011

On30 sawmill from scratch -- mill engine (5)

Platform posts and bracings:



                  


                  





12/11/2011

On30 sawmill from scratch -- mill engine (4)

Glued the mill engine and the boiler on the platform. I also added the piping and some details to it:


    



    



    


12/09/2011

On30 sawmill from scratch -- mill engine (3)

Boiler:

            

Some paint (red and brown sprayed on it):




Added the rivets and weathered:

                   
                                 

                                          





On30 sawmill from scratch -- mill engine (2)

I modified and painted a casting from Rusty Rails:


Added the flywheels and cogwheels to it:


A try on the platform:


On30 sawmill from scratch -- mill engine (1)

Started building the mill engine complex for the sawmill.

First is the platform for the engine and boiler (about 26cm x 9 cm -- 10" x 3.5"):


The planking is made from coffee stirrers:


The platform weathered:


12/02/2011

11/29/2011

On30 sawmill from scratch -- slab bin (2)

Weathered:

            

                                      


             

11/26/2011

On30 sawmill from scratch -- machinery (11)

Transfer table:

            


           
   

Layout in the sawmill:

               

11/20/2011

On30 sawmill from scratch -- machinery (10)

Live rolls:

              


             


              


                        



Connected to the cut-off saw: