Showing posts with label wolfwater layout. Show all posts
Showing posts with label wolfwater layout. Show all posts

1/02/2022

Turnouts build finished!

Finally, all the turnouts that will be used are completed. Upper (logging & station) level:
Lower (mine) level:
Total of nine turnouts (each took about one and a half hour to build) on both levels.

12/26/2021

First turnout built

The first of the five turnouts in Wolfwater (the one that leads to the logging area) was build today:

New logging / mining layout

Hi, After a pause of 6 years in modelling, i decided to start over again. This time i have in mind a 1400mm x 600mm layout. On30 gauge, logging or mining scene. I named it Wolfwater village. The initial layout plan is:
There will be a "station" area with a double track and a siding leading to the logging area. I plan also a bridge over a river with a trestle and a small tunnel on the left side.