Yard tracklaying continues. The three turnouts have been embedded in the yard tracks:
This blog contains the development of my On30 model railroad in the basement of my home.
2/27/2013
2/24/2013
2/11/2013
Trackwork started on the layout
First two turnouts are now built for the yard near the engine house and turntable.
This time I try a different approach and build the turnouts separately instead of in place like before.
Building the frog first as I spiked the rails down and flowed solder in the gap:
Then built the stock rails and closure rails while constantly checking for the correct gauge:
This time I try a different approach and build the turnouts separately instead of in place like before.
Building the frog first as I spiked the rails down and flowed solder in the gap:
Then built the stock rails and closure rails while constantly checking for the correct gauge:
Subscribe to:
Posts (Atom)