This blog contains the development of my On30 model railroad in the basement of my home.
1/29/2012
1/28/2012
1/09/2012
Trackplan -- V4
Latest changes to the trackplan:
* added the standard gauge as an interchange track
* moved the turntable to the other side
* added the standard gauge as an interchange track
* moved the turntable to the other side
1/03/2012
Trackplan -- V3
Latest and greatest version of the revised track plan:
* longer switchback
* log loader moved to the switch
* added a trestle above the switchback
* added a small creek to feed the log pond
* longer switchback
* log loader moved to the switch
* added a trestle above the switchback
* added a small creek to feed the log pond
Subscribe to:
Posts (Atom)